OPTIMAL SIDETRACK TIME EVALUATION BY SEGMENTED PROXY MODEL
Sidetrack operations which involves accessing a new zone and commingling production gives rise to
uncertainties and proxy models have shown to be able to incorporate uncertainties and mimic real-life
scenarios to an acceptable degree of accuracy. In this paper, a time-based proxy model which integrates the uncertainties that emerge as a result of several reservoir parameters was developed...
Published at Petroleum and coal
Published in 2017
G. I. Egeonu, O. D. Orodu, O. Olabode
olabode oluwasanmi » Olabode oluwasanmi holds a bachelors and PhD in petroleum engineering from covenant University and a Master degree in same field from University of Ibadan. He has supervised 20 undergraduate student project, provided theoretical and practical assistance to post graduate students (10 till date), and trained foreign interns on Eclipse software for reservoir simulation. He currently teaches... view full profile