Renewable power supply option for Smartfields implementation in oil and gas production installations in the Niger Delta.
Power supply at any level in the Nigerian Niger Delta is a challenge due to the high rate of vandalism, the lack of infrastructure and the dependence of the Smartfields implementation on the availability of highly reliable power supply systems.
Published at Society of Petroleum Engineers National Annual International Conference and Exhibition NAICE 2012 Lagos SPE 163012Nigeria
Published in 2012
Idachaba F.E Okuns G, Oluwatoyin F, Amiesimaka T, Brenan M and Hawrylak.